Installing C2RPS-PSMs

3.Perform a visual inspection of the switch devices for any signs of physical damage. Contact Enterasys Networks if there are any signs of damage. Refer to Getting Help” on page 1‐5 for details.

Table 2-1 Contents of C2RPS-CHAS8 Carton

Item

Quantity

 

 

 

C2RPS-CHAS8

1

 

 

 

 

SecureStack C2 Redundant Power System Installation Guide (9033977-xx)

1

 

 

 

 

Release Notes

1

 

 

 

 

Table 2-2 Contents of C2RPS-PSM Carton

 

 

 

 

Item

Quantity

 

 

 

 

C2RPS-PSM 150 Watt DC Power Supply Module

1

 

 

 

 

USA, NEMA Power Cord

1

 

 

 

 

C2RPS-PSM Cable

1

 

 

 

 

Notice Card

1

 

 

 

 

Installing C2RPS-PSMs

Caution: Observe all Electrostatic Discharge (ESD) precautions when handling sensitive electronic equipment.

Precaución: Al trabajar con equipos electrónicos sensibles, tome todas las precaucionesde seguridad para evitar descargas de electricidad estática.

When you receive your C2RPS‐CHAS8 chassis, a coverplate will be in place over each power‐supply slot.

To install the PSMs, refer to Figure 2‐1 and proceed as follows:

Note: To prevent EMI leakage from the chassis, keep coverplates installed over any empty power supply slots.

1.Place the chassis on a sturdy flat surface and remove the coverplates from the slots where you plan to install PSMs.

2.Align the PSM with one of the slots, then slide the PSM forward until its front panel is flush against the chassis front panel.

3.Fasten the PSM to the chassis using the captive screws.

4.Repeat steps 2 and 3 for each additional PSM.

2-2 Installation

Page 24
Image 24
Enterasys Networks C2RPS-SYS manual Installing C2RPS-PSMs