Pre-Installation Tasks

Pre-Installation Tasks

Complete the following tasks before installing the DC power supply:

Verify DC Power Compliance of Matrix X Modules

Prepare Site Wiring for DC Power Installation (page 1‐8)

Verify DC Power Compliance of Matrix X Modules

All installed modules must meet both the 940 part number and the 940 revision minimum requirements for DC power.

If you are converting an existing AC‐powered Matrix X Router system to DC power follow the procedure in Converting Existing AC‐powered Matrix X Router Systems to DC.

If the system is a new a Matrix X DC‐powered installation follow the procedure in New DC Power Matrix X System Installations (page 1‐7).

Converting Existing AC-powered Matrix X Router Systems to DC

If the system currently uses AC power and is transitioning to DC, follow this procedure to verify DC power compliance of all modules.

1.From the CLI, run the show system hardware command. In the following example, output from running the show system hardware cm 1 command is shown to illustrate information for a DC power‐compliant CM module.

matrix-x(switch-su)-> show system hardware cm 1

CM SLOT

1

 

Model:

CM Version 1.0

State:

Active

905

Part number:

9053454000

905

Serial number:

07420507635A

940

Part number:

9404179000

940

Serial number:

07475281635A

Part number:

X-CM-00