Pre-Installation Tasks

New DC Power Matrix X System Installations

If the system is a new Matrix X DC‐powered installation, follow this procedure to verify DC power compliance of all modules:

1.Obtain the model name and serial number from the front panel of each module to be installed.

2.Using the model name and serial number, fill out the worksheet in Table 1‐2.

Table 1-2 Worksheet: DC Compliance of Modules for New DC Systems

Model Part No.

 

Front Panel Serial Number

 

DC Compliant?

 

 

 

 

 

 

 

 

Last 4 digits of

Date Code

Serial

Site

940

 

 

940 Number

(year, work

Number

Code

Revision

 

 

 

week)

Counter

 

 

 

 

 

 

 

 

 

 

Example: X-CM-00

4179

0747

5281

63

5A

YES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.Compare the values in the shaded cells of the completed worksheet in Table 1‐2 to the minimum values shown in Table 1‐3 on page 1‐8 to determine the DC compliance of the modules to be installed.

Matrix X Router DC Power Supply Installation Guide 1-7

Page 25
Image 25
Enterasys Networks CM Version 1.0 manual Worksheet DC Compliance of Modules for New DC Systems