Enviro 50-1033 owner manual Initial Installation, Qualified Installers Only

Models: 50-1033

1 48
Download 48 pages 39.59 Kb
Page 24
Image 24
1. Follow installation steps 1 & 2 under INITIAL

Initial Installation

QUALIFIED INSTALLERS ONLY

Figure 34: Multi-Story Vent Pipe Installation.

Figure 33: Use of Wall Straps.

CATHEDRAL CEILING INSTALLATION:

 

1. Follow installation steps 1 & 2 under INITIAL

 

INSTALLATION - VERTICAL INSTALLATION.

 

2. Using the plumb bob, mark the centerline of

 

the venting system on the ceiling and drill a

 

small hole through the ceiling and roof at this

 

point. From the roof, locate the drill hole and

 

mark the outline of the “Cathedral Ceiling

 

Support Box”.

 

3. Remove shingles or other roof coverings as

 

necessary to cut the rectangular hole for the

 

“Support Box”. Cut the hole 1⁄8” larger than

 

the “Support Box” outline.

 

4. Lower the “Support Box” through the hole in

 

the roof until the bottom of the “Support Box”

 

protrudes at least 2 inches (5 cm) below the

 

ceiling. Align the “Support Box” both vertically

 

and horizontally with a level as shown in

 

Figure 35. Temporarily tack the “Support Box”

 

in the place through the inside walls and into

Figure 35: Cathedral Ceiling Support Box Leveling.

the roof sheathing.

24

Page 24
Image 24
Enviro 50-1033 owner manual Initial Installation, Qualified Installers Only, Follow installation steps 1 & 2 under INITIAL