Installation

Follow vent manufacturer’s guidelines for installation of venting. High temperature sealant must be used when connecting the vent pipe to the unit’s starter pipe. Improper seals at the vent joints may cause combustion byproducts to leak into the room where installed - seal as required..

THROUGH WALL WITH VERTICAL RISE AND HORIZONTAL TERMINATION INSTALLATION- RECOMMENDED:

A 45° down elbow with a rodent screen may be used in place of the termination cap (or stainless steel termination hood).

���� �������

����������� ���

�������� ���� �������

�������� �������

�� ���� ����

���� �������

�� �

Figure 12: Venting horizontally with rise.

THROUGH CONCRETE WALL WITH VERTICAL RISE INSTALLATIONS:

A 45° down elbow with a rodent screen may be used in place of the termination cap (or stainless steel termination hood).

Installation to use if there is a concrete or retaining wall in line with exhaust vent on pellet stove.

The termination must be 305mm (12”) from the outside wall and 305mm (12”) above the ground.

Horizontal frame

Termination cap

for thimble

 

Wall thimble

 

90o elbow

 

Wall framing

 

Vertical section

 

of vent pipe

 

 

Concrete Wall

EF 5

Clean out tee

Figure 13: Venting with concrete wall behind unit .

14

Page 14
Image 14
Enviro 50-1574 technical manual Venting horizontally with rise