Initial Installation
QUALIFIED INSTALLERS ONLY
NOTE: For Simpson Duravent only, place a bead of
Step 4. With the hole now framed, the wall thimble installed, and the pipe extending into the wall, proceed to the outside. Attach the termination to the pipe using RTV and
Step 5. Position the horizontal vent termination in the center of the 10 inches (25.4 cm) square hole and attach to the exterior wall with the four screws provided. The arrow on the vent termination should be pointing up. Run a bead of
VERTICAL TERMINATION:
Step 1. Check the instructions for required clearances (air spaces) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. Do not pack air spaces with insulation.
Step 2. Set the gas appliance in the desired location. Drop a plumb bob down from the ceiling to the position of the appliance flue exit, and mark the location where the vent will penetrate the ceiling. Drill a small hole at this point. Next, drop a plumb bob from the roof to the hole previously drilled in the ceiling, mark the spot where the vent will penetrate the roof. Determine if ceiling joists, roof rafters, or other framing will obstruct the venting system. You may wish to relocate the appliance, or to offset, to avoid cutting load bearing members.
Step 3. To install the Round Support Box/Wall Thimble in a flat ceiling, cut a 10 inch (25.4 cm) square hole in the ceiling, centered in the hole drilled in Step 2. Frame the hole as shown in Figure 29.
Step 4. Assemble | the desired | ||
lengths | of | black | pipe |
and elbows | necessary to | ||
reach from the appliance | |||
adapter | up | through | the |
Round | Support | Box. | |
Insure that all pipe and | |||
elbow | connections | are |
in their fully
| Vertical |
| Termination |
Elbow Strap | Storm Collar |
| Flashing |
| Roofing nails |
Figure 34. Vertical Vent Termination