Heat Recovery Unit for Domestic Hot Water

NS SPLIT INSTALLATION MANUAL

Heat Recovery Unit for Domestic Hot Water

Service valves have been provided inside the unit for connecting the discharge gas line to a water heating heat recov- ery unit (see figure 5). To make the connections, close the service valves inside the unit by turning clockwise. Using a recovery canister connect to either of the schrader ports on the DSH service valves and recover the small amount of refrig- erant trapped inside of the U-tube. Prior to brazing ensure that all refrigerant has been removed from U-tube. Once the refrigerant is removed, it is recommended that the tube be cut at the “U” to remove any excess oil that may be trapped. (This will also allow for easier removal of the tubing with a torch, since each section can be removed independently). Ser- vice valves must be protected to prevent overheating. Unbraze the 1/2-inch O.D. U-tube and run tubing from the left hand service valve to the inlet of the heat recovery unit and from the outlet of the heat recovery unit to the right hand of the service valve. Typically the one way discharge line length should be limited to 25-30 feet and line size must be increased depending on unit size and length of run. Follow the instructions supplied with the heat recovery unit for mounting location, water piping, and start up. A typical installation is shown below.

IMPORTANT - Reopen discharge line service valves before starting up unit, but only after leak checking, purging, and evacuating new discharge line.

Figure 5: Service Valves for Heat Recovery Unit Connections

To

Compressor

Heat Recovery

Unit “In”

From

Heat Recovery

Unit “Out” to

Reversing

Valve

Maximum One-Way Line Length

SIZE

1/2” OD

5/8” OD

3/4” OD

 

 

 

 

026 - 038

Up to 9 ft.

Up to 25 ft.

Up to 30 ft.

 

 

 

 

049

Up to 5 ft.

Up to 13 ft.

Up to 30 ft.

 

 

 

 

064

N/A

Up to 9 ft.

Up to 25 ft.

 

 

 

 

072

N/A

Up to 6 ft.

Up to 20 ft.

 

 

 

 

Figure 6: Typical Hot Water Piping Layout

 

Cold

Hot

Line set

 

 

To Hot Water

Venting

 

Generator

 

 

Waste Valve or

 

 

Vent Coupling

 

 

P/T Relief

 

Valve

Insulated Line set

With UV Paint

To Air handler

Add-on

 

 

Hot Water

 

 

Generator with

 

 

Internal Pump

Drain Valve

Pipe Tee

12