Installation To Wood Joist Ceilings
1 | Drill two 5/32" (4 mm) dia. holes to a minimum depth |
of 2.5" (64 mm). Attach ceiling plate (G) with two |
#14 x 2.5" (6 mm x 65 mm) wood screws (F) as shown using 3/8" (10 mm) socket wrench.
Skip to step 2.
WARNING
•Tighten wood screws (F) so that wall plate (G) is firmly attached, but do not overtighten. Overtightening can damage the screws, greatly reducing their holding power.
•Never tighten in excess of 80 in • lb (9 N.M.).
•Make sure that mounting screws are anchored into the center of the studs. The use of an "edge to edge" stud finder is highly recommended.
WARNING
•It is the responsibility of the installer to verify that the supporting surface will safely support the combined load of all attached hardware and components.
IMPORTANT: Be sure to drill holes into the joist CENTER!
WOOD
JOIST
CEILING
WOOD
JOIST
CEILING
G
F
For optional Cord Management, install two spacers (H) between ceiling plate (G) and ceiling.
H
H
G
F
5 of 10 | ISSUED: |
Visit the Peerless Web Site at www.peerlessmounts.com | For Technical Support Contact Peerless Mounts at |