Step 13:
ROUTING THE PEC DEC CABLE:
Attach the eyelet end of the cable to the bracket
on the Right Pec Dec Arm (10) using one 3/8" x
1-1/4" Hex Head Bolt (80) and one 3/8" Nylon
Nut (94).
Route the cable around pulley P2, through the
slot in the Base Frame (1), around pulley P3, up
and around pulley P4, through the hole in the
Base Frame (1), down and around pulley P5,
through the slot in the Base Frame (1), continue
through the slot in the Pec Dec Base Frame (6),
around pulley P6, continue around pulley P7.
Attach the other eyelet end of the cable to the
bracket on the Left Pec Dec Arm (11) using one
3/8" x 1-1/4" Hex Head Bolt (80) and one 3/8"
Nylon Nut (94).
ASSEMBLY
assembly instructions
-19-
PEC DEC CABLE PATH
P1
P2
P3
P4
P5
P6
P7
P8
C2
PEC DEC CABLE (43) eyelet endeyelet end
FIG-P5,P6
FIG-P1,P8
FIG-P3
C2
FIG-P4
FIG-P1,P8