Manuals
/
Exide
/
Power Tools
/
Work Light
Exide
PAR20
manual
Models:
PAR20
1
1
29
29
Download
29 pages
10.87 Kb
1
2
3
4
5
6
7
8
Install
Maintenance
System Assembly
Battery Operation
Tip Over Procedure
Safety
Page 1
Image 1
®
SECTION 92.80
2008-07
Installation and Operating
Instructions
For
ABSOLYTE
®
GX Batteries
®
Page 1
Page 2
Page 1
Image 1
Page 1
Page 2
Contents
Page
Table of Contents
System Arrangements
13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 14.0 14.1 15.0 15.1
List of Tables
List of Illustrations
Appendices
Appendix a
General
Safety Messages
Sulfuric Acid Burns
Explosive Gases
Delivery Information
Installation Considerations
Page
Table a
Table B
Unpacking
System Arrangements
System Assembly
Unpacking Modules
Handling Module
Tip Over Procedure
Beam Hardware Installation Beam Support Installed
TIP-OVER PROCEDUREFigure- SHACKLE9 -STRAP Usage
Bottom Supports I-beams
Horizontal Stacking SHACKLE-STRAP Usage
TIP-OVER Procedure Module After TIP-OVER
Electrical Connections
Installing Completed Hardware Horizontal Stack
Positioning Horizontal Base Modules
TIE Plate Assemblies Horizontal Stacks
Stack Connections
Identification Labels
Description QTY PER System
Terminal Plate Kit Materials & Assembly
Initial Charge
Protective Module Covers
Step
Table C
Description QTY PER System
Module Clear Cover Materials and Assembly
Temperature Correction
Battery Operation
Recommended Float Range @77F
Effects of Float Voltage
Equalizing Charge
Table D
Ohmic Measurements
Table E
Recordkeeping
Maintenance
Unit Cleaning
Capacity Testing
TAP Connections
Absolyte Battery Maintenance Report
Type MANUF. Date Install Date System Voltage
Battery Temperature C
104 105 106 107 108 109 110 111 112 113
100 103
Appendix C
Bonding & Grounding of Battery Rack
Page
Exide Technologies Industry Leader
Top
Page
Image
Contents