Manuals
/
Exide
/
Power Tools
/
Work Light
Exide
PAR20
manual
Models:
PAR20
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
29
Download
29 pages
10.87 Kb
3
4
5
6
7
8
9
10
11
12
Install
Maintenance
System Assembly
Battery Operation
Tip Over Procedure
Safety
Page 8
Image 8
8
Page 7
Page 9
Page 8
Image 8
Page 7
Page 9
Contents
Page
Table of Contents
System Arrangements
13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 14.0 14.1 15.0 15.1
List of Illustrations
List of Tables
Appendices
Appendix a
Safety Messages
General
Sulfuric Acid Burns
Explosive Gases
Installation Considerations
Delivery Information
Page
Table a
Unpacking
Table B
System Assembly
System Arrangements
Unpacking Modules
Handling Module
Beam Hardware Installation Beam Support Installed
Tip Over Procedure
TIP-OVER PROCEDUREFigure- SHACKLE9 -STRAP Usage
Bottom Supports I-beams
TIP-OVER Procedure Module After TIP-OVER
Horizontal Stacking SHACKLE-STRAP Usage
Installing Completed Hardware Horizontal Stack
Electrical Connections
Positioning Horizontal Base Modules
TIE Plate Assemblies Horizontal Stacks
Identification Labels
Stack Connections
Terminal Plate Kit Materials & Assembly
Description QTY PER System
Protective Module Covers
Initial Charge
Step
Table C
Module Clear Cover Materials and Assembly
Description QTY PER System
Recommended Float Range @77F
Battery Operation
Temperature Correction
Equalizing Charge
Effects of Float Voltage
Table D
Ohmic Measurements
Recordkeeping
Table E
Unit Cleaning
Maintenance
Capacity Testing
TAP Connections
Absolyte Battery Maintenance Report
Type MANUF. Date Install Date System Voltage
Battery Temperature C
100 103
104 105 106 107 108 109 110 111 112 113
Bonding & Grounding of Battery Rack
Appendix C
Page
Exide Technologies Industry Leader
Top
Page
Image
Contents