P/2 DA4xi and P/2 DA6xi, cont’d
3.Mechanical loading — Mount the equipment in the rack so that uneven mechanical loading does not create a hazardous condition.
4.Circuit overloading — Connect the equipment to the supply circuit and consider the effect that circuit overloading might have on overcurrent protection and supply wiring. Give appropriate consideration to the equipment nameplate ratings when addressing this concern.
5.Reliable earthing (grounding) — Maintain reliable grounding of
Rack mounting procedure
The distribution amplifier can be mounted on any of the following optional rack shelves:
RSU 126 6" deep 1U Rack Shelf Kit (part
To install and set up the P/2 DA4xi or P/2 DA6xi on a rack, follow the steps on the next page and see the diagram below:
6" Deep Rack Shelf 1/2 Rack Width Front False
Faceplate
Front false faceplate uses 2 screws.
(2)
Use 2 mounting holes on opposite corners.