Measurement Performance
During meter verification, you can choose between setting digital communications process variable values to the configured fault indicator or the last measured value. The values will remain fixed for the duration of the test (approximately four minutes). Disable all control loops for the duration of the procedure, and ensure that any data reported during this period is handled appropriately.
To perform meter verification:
•Using ProLink II, follow the procedure illustrated in Figure
•Using the display menu, follow the procedure illustrated in Figure
•Using a DeviceNet tool, follow the procedure illustrated in Figure
For a discussion of meter verification results, see Section 10.3.1.
Figure
Tools >
Meter Verification >
Structural Integrity Method
Verify configuration
parameters
View previous test data
Yes
| Next |
|
|
|
|
|
| Back(1) | Graph of results |
| Enter optional test data |
|
| |
|
|
|
| Next |
| Next |
|
| View report (option to print |
|
|
|
| |
|
|
|
| or save) |
| Initialize and start meter |
|
| |
| verification |
|
| Finish(2) |
|
|
|
| |
| Start |
|
|
|
Fault | Hold last |
|
| |
configuration | value |
|
| |
| Progress bar shows | Abort |
| |
| test in progress |
| ||
|
|
| ||
Abort | Fail | Pass | Back |
|
|
|
| Next |
|
Rerun |
|
|
|
| (1) If the graph was viewed at the beginning of the procedure, |
| No |
| |||
|
| clicking Back here will return to the beginning of the procedure | |||
test? |
|
|
|
| |
|
|
|
| ||
|
|
|
| (along the dotted line). | |
|
|
|
|
|
(2)The results of the meter verification test are not saved until Finish is clicked.
92 | Micro Motion® Model 2400S Transmitters for DeviceNet™ |