FIGURE 13

Step 71. Attach two PULLEYS (76) to LEG PRESS SUPPORT (23) with 3/8” x 4-1/2” HEX BOLT (57), 3/ 8” WASHERS (62) and 3/8” LOCKNUTS (67).

Step 72. Attach a PULLEY (76) to four SINGLE BRACKETS with 3/8” x 2” HEX BOLT (51), 3/8” WASH- ERS (62) and 3/8” LOCKNUT (67).

Step 73. Insert PULLEY (76) into SLOT of LEFT OBLIQUE FRAME (4) and fasten with 3/8” x 2-5/8” HEX BOLT (53), 3/8” WASHERS (62), 13mm BUSHINGS (46) and 3/8” LOCKNUT (67).

Step 74. Attach two PULLEYS (76) to DOUBLE BRACKET with 3/8” x 3-1/2” HEX BOLT (56), 3/8” WASH- ERS (62) and 3/8” LOCKNUT (67).

Step 75. Attach one end of SQUAT CABLE (68) to CABLE LOCK on LEFT BASE BEAM (6) with M8 x 25mm HEX BOLT (48), M8 WASHERS (64) and M8 LOCKNUT (69).

Step 76. The other end of the SQUAT CABLE (68) can be inserted around all remaining PULLEYS (76) as shown in FIGURE 13 and DETAIL. Follow the cable route starting at position “A” and ending with position “K”.

Step 77. Attach CHAIN (91) to end of SQUAT CABLE (68) with CHAIN HOOK (90).

Step 78. Attach other end of CHAIN (91) to PRESS CABLE (55) with CHAIN HOOK (90).

NOTE: The CHAIN is used to remove large amounts of slack in cable. The HEFT CABLE AD- JUSTER is used to remove small amounts of slack.

Step 79. Make sure SQUAT CABLE (68) is riding in groove of PULLEYS (76).

28

Page 28
Image 28
Fitness Quest Brutus 655 manual