FIGURE 2

Step 8. Slide RUBBER DONUTS (82) onto one end of each GUIDE ROD (9) and insert into CENTER BASE TUBE “B” (8).

Step 9. Slide a total of 14 WEIGHTS (79), ONE AT A TIME, down GUIDE RODS (9) on the RIGHT BASE BEAM (1) side, with SLOT on bottom and facing forward as shown.

Step 10. Slide the other 19 WEIGHTS (79), ONE AT A TIME, down GUIDE RODS (9) on the LEFT BASE BEAM

(6)side, with SLOT on bottom and facing forward as shown.

Step 11. Insert WEIGHT SELECTOR ROD “A”

(42)through center of 14 high WEIGHT (79) stack.

Step 12. Insert WEIGHT SELECTOR ROD “B”

 

(43) through center of 19 high

55

 

PRESS

 

WEIGHT (79) stack.

 

CABLE

 

WARNING: Someone will need to

 

 

 

hold this stack until Step 21 is com-

 

 

pleted.

 

Step 13. Slide TOP PLATES (77) onto both

79

 

WEIGHT (79) stacks.

 

WEIGHT

 

 

Step 14.

Fasten TOP PLATES (77) through

(14 total)

 

 

top hole of WEIGHT SELECTOR

 

 

RODS (42 & 43) with 7/16” ALLEN

 

 

CAP SCREW (78).

 

Step 15. Thread PRESS CABLES (55) into

WEIGHT SELECTOR RODS (42 & 43).

Step 16. Insert PRESS BAR PIN (80) into de- sired SLOT in WEIGHTS (79) and through WEIGHT SELECTOR RODS (42 & 43).

1

 

RIGHT

 

BASE

82

BEAM

RUBBER

 

80

DONUT

PRESS

 

BAR PIN

8

FIGURE 2

CENTER

BASE TUBE

(B)

9

GUIDE

ROD

42

WEIGHT

SELECTOR

ROD “A”

77

TOP

PLATE

78

7/16”

ALLEN

CAP

SCREW

SLOT

80

PRESS

BAR PIN

6

LEFT BASE

BEAM

55

PRESS CABLE

43

WEIGHT

SELECTOR

ROD “B”

79

WEIGHT (19 total)

82

RUBBER

DONUT

14

Page 14
Image 14
Fitness Quest Brutus 655 manual CAP Screw