FIGURE 2
Step 8. Slide RUBBER DONUTS (82) onto one end of each GUIDE ROD (9) and insert into CENTER BASE TUBE “B” (8).
Step 9. Slide a total of 14 WEIGHTS (79), ONE AT A TIME, down GUIDE RODS (9) on the RIGHT BASE BEAM (1) side, with SLOT on bottom and facing forward as shown.
Step 10. Slide the other 19 WEIGHTS (79), ONE AT A TIME, down GUIDE RODS (9) on the LEFT BASE BEAM
(6)side, with SLOT on bottom and facing forward as shown.
Step 11. Insert WEIGHT SELECTOR ROD “A”
(42)through center of 14 high WEIGHT (79) stack.
Step 12. Insert WEIGHT SELECTOR ROD “B”
| (43) through center of 19 high | 55 |
| PRESS | |
| WEIGHT (79) stack. | |
| CABLE | |
| WARNING: Someone will need to | |
|
| |
| hold this stack until Step 21 is com- |
|
| pleted. |
|
Step 13. Slide TOP PLATES (77) onto both | 79 | |
| WEIGHT (79) stacks. | |
| WEIGHT | |
|
| |
Step 14. | Fasten TOP PLATES (77) through | (14 total) |
| ||
| top hole of WEIGHT SELECTOR |
|
| RODS (42 & 43) with 7/16” ALLEN |
|
| CAP SCREW (78). |
|
Step 15. Thread PRESS CABLES (55) into
WEIGHT SELECTOR RODS (42 & 43).
Step 16. Insert PRESS BAR PIN (80) into de- sired SLOT in WEIGHTS (79) and through WEIGHT SELECTOR RODS (42 & 43).
1 |
| |
RIGHT |
| |
BASE | 82 | |
BEAM | ||
RUBBER | ||
| ||
80 | DONUT | |
PRESS |
| |
BAR PIN | 8 | |
FIGURE 2 | CENTER | |
BASE TUBE | ||
(B) |
9
GUIDE
ROD
42
WEIGHT
SELECTOR
ROD “A”
77
TOP
PLATE
78
7/16”
ALLEN
CAP
SCREW
SLOT
80
PRESS
BAR PIN
6
LEFT BASE
BEAM
55
PRESS CABLE
43
WEIGHT
SELECTOR
ROD “B”
79
WEIGHT (19 total)
82
RUBBER
DONUT
14