Chassis Installation

1.Lift unit level and slide unit into wall sleeve until from seal rests firmly against front of wall sleeve.

Figure 23

Securing Unit

POWER

SUPPLY

CORD

FRP023

2.Locate the four supplied chassis mounting screws. Insert the screws through the chassis mounting flange holes that are aligned with the speed nuts in the wall sleeve. Tighten all four screws (two per side).

Figure 24

Replacing Front Panel

1

2

FRP024

3.Place tabs over top rail (1). Push inward at bottom until panel snaps into place (2).

4.Reinstall front panel. See Figure 24.

CAUTION

Excessive Weight Hazard

Use two or more people when installing your air conditioner.

Failure to do so can result in back or other injury.

NOTICE

Copper refrigerant tubes are NOT handles. Do NOT use tubing to lift or move chassis.

To remove the front cover, pull the bottom end forward and lift it up to clear the L bracket across the top of the chassis.

5.Plug the cord (if applicable) into the appropriate receptacle. Restore power to the unit.

18

Page 20
Image 20
Friedrich 920-087-09 operation manual Chassis Installation, Securing Unit, Excessive Weight Hazard