Installation
Figure 6
(Note: two people may be required for proper installation of model FIJI).
8.Install transition to top of hood (if removed for shipping). Snap damper into transition, foam tape up , with firm pressure at either end. Mark onto exterior of transition the 'V' location of the damper within. See Figure 6.
9.Adjust chimney mounting structure to S dimension as determined in Step 1, page 5. Use 2 screws per attachment leg. Do not fasten to ceiling now.
10.Set chimney mounting structure on top of hood canopy. Attach nuts loosely. See Figure 8 and 9.
D |
Figure 7 |
E |
F |
Figure 9 |
Figure 8 |
Figure 10 |
11.Fit duct piece on transition so that top end is
12.Remove chimney structure from hood canopy.
13.Install Ducting. Fasten duct to transition with screws and tape per code. Loosely fasten starter collar (included) flush to top of duct. Note: screws must not hamper the damper (see 8. above for screw location).
Loosely fasten starter collar (included) flush to bottom of duct.
14.To install Chimney Structure to ceiling, use a 10mm or adjustable wrench or flat head screwdriver. Drill pilot holes into ceiling. Attach mounting structure to joists with the 4 lag screws provided. (Keep 1/2" conduit inside structure.) See Figure 3.
15.Remove Chimney Cover's plastic protective film. Reassemble and fasten all 3 covers together with one vertical screw. See Figure 7. Slide over chimney structure and secure with 2 screws near ceiling.
16.To fasten the canopy use a 10mm or adjustable wrench. Affix nuts to top of canopy.
Do not tighten. Raise canopy up to chimney structure and twist in place. See Figure 9. Tighten nuts securely.
17.Ducting for all units: There should be no more than 1" gap between canopy ducting and house ducting. Adjust starting collar over both ducts. Tighten collar. Fasten duct with screws and tape per code. Make final angular adjustment to unit at ceiling if necessary, then securely tighten 4 ceiling lag screws if not already tightened.
6