![Step 10d - Remove last two screws and pull conveyor away from housing.](/images/new-backgrounds/59881/598819x1.webp)
Step 10d - Remove last two screws and pull conveyor away from housing. ![Step 10c - Remove these four hex head screws and two nuts.](/images/new-backgrounds/59881/598819xi2.webp)
Step 10c - Remove these four hex head screws and two nuts.
Step 10b - Remove cartridge heater.
Step 10a - Remove drive pulley.
11.To remove the toasting conveyor assembly: (See illustration on following page.)
a.Detach the platen and probe wiring from the relay,
b.Loosen the setscrew in the second drive pulley from the front and remove the pulley.
c.Remove the five flange nuts that secure the idler assembly to the housing and remove the idler assembly.
d.Remove the two hex head screws shown in Step 11d of the illustration on the following page.