Frymaster FGP55 a.Rethermalizer is level under the vent hood, Refer to , Installation, page 2-1

Models: FGP55

1 28
Download 28 pages 60.93 Kb
Page 6
Image 6
FGP55 Rethermalizer Sequence of Operation

FGP55 Rethermalizer Sequence of Operation

1.Ensure the unit is properly installed. Check the following:

a.Rethermalizer is level under the vent hood.

b.Gas supply is connected properly with the proper gas type (natural or propane) with the correct size lines. Have the installer check for proper gas pressure and for gas leaks.

c.Water connected properly to the coupling at the rear of the unit.

d.Ensure drain plumbing is routed to the disposal area.

e.Perform boil-out before first use and periodically thereafter.

Refer to Chapter 2, Installation, page 2-1 — 2.8.

2. Ensure the product basket is properly placed in the heating vessel.

3.Perform Lighting Instructions.

4.Ensure drain valve is closed. Turn the computer

on by pressing the a.Rethermalizer is level under the vent hood. switch. Note: A decimal between digits 1 and 2 in either LED display indicates that the burners are lit.

5.Monitor operation of unit as the water reaches temperature. The computer will display Refer to Chapter 2, Installation, page 2-1 — 2.8. as water temperature nears programmed setpoint.

Refer to Lighting Instructions, pages 3-13-2.

Refer to Chapter 3, Operating Instructions, page 3-4 — 3.9 for specific product settings and desired temperatures.

6.When the water reaches the desired temperature, place product in the slotted product basket.

7.Remove product from the basket after the specified time.

v

Page 6
Image 6
Frymaster FGP55 operation manual a.Rethermalizer is level under the vent hood, Refer to , Installation, page 2-1