HEATED LANDING ZONE
CHAPTER 3: INSTALLATION AND OPERATION
The Heated Landing Zone or HLZ is designed to hold assembled sandwiches. By circulating heated air evenly across the open staging area, the Heated Landing Zone keeps sandwiches hot without drying or cooking. The Heated Landing Zone meets all McDonald’s standards for safety, efficiency, food safety, and cleanliness.
3.1 HLZ Installation/Setup
Upon arrival, inspect the HLZ for concealed damage. Immediately report any damage to the delivering freight company. Claims must be filed within 15 days after receipt of the unit.
Make sure that the unit is placed on an even surface and that the area surrounding the HLZ is free of clutter that would interfere with airflow.
Install Optional Burger Bumper (Units Built Before 10/98)
The burger bumper may be placed on either side of the HLZ to prevent pass through of product. Burger bumpers are provided by the KES. See Figure 1.
Install Filter Screen (Units Built After 10/98)
The filter screen is design to prevent debris from entering the computer Cowl Assembly and clogging the blower assembly. Simply fit the part on to the vent opening of the computer cowl assembly. The filter screen will snap into position. If equipped with an optional holding screw, tighten screw to pull the filter screen snug into position.
Power Requirements
Optional Burger Bumper
Installed (before 10/98)
Computer
Cowl
Figure 1
• | Voltage – Two models are available: 208 VAC and 240 VAC* | The filter screen snaps into place on |
• | Frequency - 60 Hz | rear of the |
|
•Single Phase
• | 20 amp Service |
| DANGER |
| ||
If the 240 VAC model is | ||||||
|
| |||||
3.2 HLZ Operation | operated on 208 VAC, the | |||||
unit will heat slowly and | ||||||
1. | Plug the unit into the power source. | may not reach maximum | ||||
temperature. | If the | 208 | ||||
|
| |||||
2. | See Chapter 5, Computer Operation and Programming, for proper computer | VAC model is operated on | ||||
| setup and operation. | 240 | VAC, | component | ||
|
| damage is | likely. | To | ||
3. | Place product in the HLZ in accordance with the restaurant’s established | ensure | proper operation, | |||
| procedures. | the power source should | ||||
4. | When closing the store, remove all product from the HLZ and perform daily | match the voltage on the | ||||
rating plate on the bottom | ||||||
| preventive maintenance in accordance with the MRC. Turn the computer | of the HLZ. |
|
| ||
| OFF. |
|
|
|
| |
|
|
|
|
|
ALL UNITS (CORD CONNECTED OR PERMANENTLY CONNECTED) SHOULD BE CONNECTED TO A GROUNDED POWER SUPPLY SYSTEM.
THIS APPLIANCE IS EQUIPPED WITH A GROUNDING PLUG FOR YOUR PROTECTION AGAINST SHOCK HAZARD AND MUST BE PLUGGED INTO A PROPERLY GROUNDED RECEPTACLE. DO NOT CUT OR REMOVE THE GROUNDING PRONG FROM THIS PLUG.
3