Operations

Orca 80-99 Operation and Maintenance Manual

 

 

PROCESS CONTROL CHART 2-2

Process: Hot Mount, One PassMaterials (top/bottom): /3/16" thick Hot tissue coated board

Front Control Panel

 

Rear Control Panel

Adjustments

 

Adjustments

 

 

 

 

 

Top Brake

OFF / NA

Top Heat

ON / 245o F (118o C)

Top Clutch

OFF / NA

Bottom Heat

OFF / NA

 

 

 

 

Laminator Roller

ON / 40 p.s.i.

Top Cooling Fans

OFF

 

 

 

 

Bottom Brake (front)

OFF / NA

Bottom Cooling Fans

OFF

 

 

 

 

Bottom Clutch (front)

OFF / NA

Pull Roller Clutch

OFF / NA

 

 

 

 

Forward/Reverse

FORWARD

Pull Roller Pressure

OFF / NA

 

 

 

 

Speed

2 - 3 f.p.m.

Bottom Brake (rear)

OFF / NA

 

 

 

 

Laminator Roller Shims

3/16"

Bottom Clutch (rear)

OFF / NA

 

 

 

 

 

 

Pull Roller Shims

NA

 

 

 

 

Helpful Hints/Notes:

Lay the image to be mounted on the board and push the board into the nip while the rolls are not turning. Then, quickly, depress the foot switch to turn the rolls. Make sure to maintain good paper tension while mounting the image.

Page 5 - 12

© GBC Films Group June 2000