Installation Instructions

7REPLACE THE BASE GRILLE

Replace the grille by installing the two Phillips head screws.

8SET THE CONTROLS

Set the controls to the recommended setting.

9START THE ICEMAKER

Set the icemaker power switch to the I (on) position. The icemaker will not begin to operate until it reaches its operating temperature of 15°F (–9°C) or below. It will then begin operation automatically. It will take 2–3 days to fill

the ice bin.

Power switch

NOTE:

In lower water pressure conditions, the water valve may turn on up to 3 times to deliver enough water to the icemaker.

23