Anti-tip bracket installation
Anti-Tip Bracket Installation
36”
•The kit supplied with the unit contains 2 lag bolts and 4 toggles with bolts. The wall bracket will be attached to the wall in 4 places.
•Measure the opening where the unit is to be
installed. Mark the center with a vertical line.
• Measure up 81 1/2” from the floor. Mark this point on the wall.
•Using a level, draw a horizontal line on the wall at this height.
•Locate at least 2 studs on the back wall. Mark these points on the horizontal line.
•Place the bottom of the wall bracket with tabs on the horizontal line. Align the center notch on the bracket with the center line on the wall.
•The
on the center of the studs. Mark the wall
at these points.
•Mark an additional hole at each end
of the bracket. If one of the studs is closer
to the end of the bracket, mark an additional | Center | Wall Bracket |
hole towards the center of the bracket. |
| |
|
| |
• Drill 1/2” holes into the wall board |
|
|
at the locations marked for the toggles |
|
|
to be mounted (not the stud markings). |
|
|
• Drill 3/16” holes into wooden studs where |
| Line On Wall |
marked. If steel stud construction, drill 1/2” |
|
|
holes into the studs where marked. You will | Two Additional |
|
use 2 toggles with the metal studs. | Hole Locations at |
|
Ends of Brackets |
| |
| Wall Studs |
|
Line on Wall
Center
16