Installation Instructions

INSTALLING THE REFRIGERATOR (CONT.)

1

A

B

CONNECTING THE REFRIGERATOR TO THE HOUSE WATER LINE (icemaker and dispenser models)

A cold water supply is required for automatic icemaker and dispenser operation. If there is not a cold water supply, you will need to provide one. See “Installing the Water Line” section.

NOTES:

Before making the connection to the refrigerator, be sure the refrigerator power cord is not plugged into the wall outlet.

If your refrigerator does not have a water filter, we recommend installing one if your water supply has sand or particles that could clog the screen of the refrigerator’s water valve. Install it in the water line near the refrigerator. If using GE SmartConnectRefrigerator Tubing Kit, you will need an additional tube (WX08X10002) to connect the filter. Do not cut plastic tube to install filter.

If you are using copper tubing, place a compression nut and ferrule (sleeve) onto the end of the tubing coming from the house cold water supply.

If you are using the GE SmartConnecttubing, the nuts are already assembled to the tubing.

If you are using copper tubing, insert the end of the tubing into the refrigerator connection, at the back of the refrigerator, as far as possible. While holding the tubing, tighten the fitting.

If you are using GE SmartConnecttubing, insert the molded end of the tubing into the refrigerator connection, at the back of the refrigerator, and tighten the compression nut until it is hand tight. Then tighten one additional turn with a wrench. Overtightening may cause leaks.

CFasten the tubing into the clamp provided to hold it in position. You may need to pry open the clamp.

Tubing Clamp

 

1/4 Tubing

1/4

 

Compression Nut

 

Ferrule

 

(sleeve)

 

Refrigerator

SmartConnectTubing

Connection

 

2TURN ON THE WATER SUPPLY

Turn the water on at the shutoff valve (house water supply) and check for any leaks.

3PLUG IN THE REFRIGERATOR

Before plugging in the refrigerator, make sure the icemaker power switch is set to the O (off) position.

See the grounding information attached to the power cord.

22

Page 22
Image 22
GE 25 and 27 installation instructions Turn on the Water Supply, Plug in the Refrigerator

25 and 27 specifications

The GE 25 and 27 series represent a significant evolution in the realm of gas turbine technology, tailored for both industrial and power generation applications. These advanced turbines are well-regarded for their impressive efficiency, reliability, and adaptability to various operational needs.

The GE 25 engine, known for its robust design, is specifically engineered to deliver high performance in a compact footprint. It boasts a power output of approximately 25 megawatts, making it suitable for a variety of applications, including peak power generation and co-generation systems. Its features include advanced aerodynamics in the compressor section, ensuring optimal airflow and reduced pressure losses. The turbine also incorporates a sophisticated control system, enabling real-time adjustments that optimize performance while minimizing emissions.

In contrast, the GE 27 turbine achieves even greater power output, reaching up to 27 megawatts. This engine is designed with an emphasis on efficiency and reduced operational costs, making it an attractive choice for utility operators and industrial power plants. One of its key technologies includes the use of advanced materials in the turbine blades, which allow for higher operating temperatures and pressure ratios. This innovation translates to a significant boost in thermal efficiency, reducing fuel consumption and environmental impact.

Both the GE 25 and 27 utilize advanced diagnostic tools and monitoring systems. These technologies enable operators to track engine performance effectively, predicting maintenance needs and enhancing overall operational reliability. The inclusion of digital twin capabilities allows for real-time simulations that can identify potential inefficiencies before they develop into serious issues.

The modular design of these turbines facilitates quick maintenance and parts replacement, minimizing downtime and ensuring continuous power supply. Additionally, their versatility makes them suitable for a wide range of fuels, including natural gas, diesel, and even renewable biogas. This adaptability positions the GE 25 and 27 as forward-thinking solutions that align with the global push towards greener energy sources.

In summary, the GE 25 and 27 turbines exemplify modern gas turbine technology, merging high efficiency with innovative features. Their ability to perform under a variety of conditions while maintaining low emissions places them at the forefront of power generation advancements. As industries continue to seek reliable and sustainable energy solutions, the GE 25 and 27 stand as compelling options for both current and future power demands.