Installation Instructions

INSTALLING THE WATER LINE (CONT.)

WHAT YOU WILL NEED (CONT.)

NOTE: The only GE approved plastic tubing is that supplied in GE SmartConnectRefrigerator Tubing kits. Do not use any other plastic water supply line because the line is under pressure at all times. Certain types of plastic will crack or rupture with age and cause water damage to your home.

A GE water supply kit (containing tubing, shutoff valve and fittings listed below) is available at extra cost from your dealer or from Parts and Accessories, 800.626.2002 (in Canada 1.888.261.3055).

A cold water supply. The water pressure must be between 20 and 120 p.s.i. (1.4–8.1 bar).

Power drill.

1/2or adjustable wrench.

Straight and Phillips blade screwdriver.

Two 1/4 outer diameter compression nuts and 2 ferrules (sleeves)—to connect the copper tubing to the shutoff valve and the refrigerator water valve.

OR

If you are using a GE SmartConnectRefrigerator Tubing kit, the necessary fittings are preassembled to the tubing.

If your existing copper water line has a flared fitting at the end, you will need an adapter (available at plumbing supply stores) to connect the water line to the refrigerator OR you can cut off the flared fitting with a tube cutter and then use a compression fitting. Do not cut formed end from GE SmartConnectRefrigerator tubing.

Shutoff valve to connect to the cold water line. The shutoff valve should have a water

inlet with a minimum inside diameter of 5/32at the point of connection to the COLD WATER LINE. Saddle-type shutoff valves are included in many water supply kits. Before purchasing, make sure a saddle-type valve complies with your local plumbing codes.

Install the shutoff valve on the nearest frequently used drinking water line.

1SHUT OFF THE MAIN WATER SUPPLY

Turn on the nearest faucet long enough to clear the line of water.

2CHOOSE THE VALVE LOCATION

Choose a location for the valve that is easily accessible. It is best to connect into the side of a vertical water pipe. When it is necessary to connect into a horizontal water pipe, make the connection to the top or side, rather than at the bottom,

to avoid drawing off any sediment from the water pipe.

3DRILL THE HOLE FOR THE VALVE

Drill a 1/4hole in the water pipe (even if using a self-piercing valve), using a sharp bit. Remove any burrs resulting from drilling the hole in the pipe.

Take care not to allow water to drain into the drill.

Failure to drill a 1/4hole may result in reduced ice production or smaller cubes.

26

Page 26
Image 26
GE 25 and 27 installation instructions Installing the Water Line, Shut OFF the Main Water Supply, Choose the Valve Location

25 and 27 specifications

The GE 25 and 27 series represent a significant evolution in the realm of gas turbine technology, tailored for both industrial and power generation applications. These advanced turbines are well-regarded for their impressive efficiency, reliability, and adaptability to various operational needs.

The GE 25 engine, known for its robust design, is specifically engineered to deliver high performance in a compact footprint. It boasts a power output of approximately 25 megawatts, making it suitable for a variety of applications, including peak power generation and co-generation systems. Its features include advanced aerodynamics in the compressor section, ensuring optimal airflow and reduced pressure losses. The turbine also incorporates a sophisticated control system, enabling real-time adjustments that optimize performance while minimizing emissions.

In contrast, the GE 27 turbine achieves even greater power output, reaching up to 27 megawatts. This engine is designed with an emphasis on efficiency and reduced operational costs, making it an attractive choice for utility operators and industrial power plants. One of its key technologies includes the use of advanced materials in the turbine blades, which allow for higher operating temperatures and pressure ratios. This innovation translates to a significant boost in thermal efficiency, reducing fuel consumption and environmental impact.

Both the GE 25 and 27 utilize advanced diagnostic tools and monitoring systems. These technologies enable operators to track engine performance effectively, predicting maintenance needs and enhancing overall operational reliability. The inclusion of digital twin capabilities allows for real-time simulations that can identify potential inefficiencies before they develop into serious issues.

The modular design of these turbines facilitates quick maintenance and parts replacement, minimizing downtime and ensuring continuous power supply. Additionally, their versatility makes them suitable for a wide range of fuels, including natural gas, diesel, and even renewable biogas. This adaptability positions the GE 25 and 27 as forward-thinking solutions that align with the global push towards greener energy sources.

In summary, the GE 25 and 27 turbines exemplify modern gas turbine technology, merging high efficiency with innovative features. Their ability to perform under a variety of conditions while maintaining low emissions places them at the forefront of power generation advancements. As industries continue to seek reliable and sustainable energy solutions, the GE 25 and 27 stand as compelling options for both current and future power demands.