Installation Instructions

INSTALLING THE WATER LINE (ICEMAKER & DISPENSER MODELS)

BEFORE YOU BEGIN

Recommended copper water supply kits are WX8X2, WX8X3 or WX8X4, depending on the amount of tubing you need. Approved plastic water supply lines are GE SmartConnectRefrigerator Tubing (WX08X10002, WX08X10006, WX08X10015 and WX08X10025).

When connecting your refrigerator to a GE Reverse Osmosis Water System, the only approved installation is with a GE RVKit. For other reverse osmosis water systems, follow the manufacturer’s recommendations.

If the water supply to the refrigerator is from a Reverse Osmosis Water Filtration System AND the refrigerator also has a water filter, use the refrigerator’s filter bypass plug. Using the refrigerator’s water filtration cartridge in conjunction with the RO filter can result in hollow ice cubes and slower water flow from the water dispenser.

This water line installation is not warranted by the refrigerator or icemaker manufacturer. Follow these instructions carefully to minimize the risk of expensive water damage. Water hammer (water banging in the pipes) in house plumbing can cause damage to refrigerator parts and lead to water leakage or flooding. Call a qualified plumber to correct water hammer before installing the water supply line to the refrigerator.

To prevent burns and product damage, do not hook up the water line to the hot water line. If you use your refrigerator before connecting the water line, make sure the icemaker power switch is in the O (off) position.

Do not install the icemaker tubing in areas where temperatures fall below freezing. When using any electrical device (such as a power drill) during installation, be sure the device is double insulated or grounded in a manner to prevent the hazard of electric shock, or is battery powered.

All installations must be in accordance with local plumbing code requirements.

WHAT YOU WILL NEED

Copper or GE SmartConnectRefrigerator Tubing kit, 1/4outer diameter to connect the refrigerator to the water supply. If using copper, be sure both ends of the tubing are cut square.

To determine how much tubing you need: measure the distance from the water valve on the back of the refrigerator to the water supply pipe. Then add 8(2.4 m). Be sure there is sufficient extra tubing (about 8[2.4 m] coiled into 3 turns of about 10[25 cm] diameter) to allow the refrigerator to move out from the wall after installation.

GE SmartConnectRefrigerator Tubing Kits are available in the following lengths:

2(0.6 m) – WX08X10002

6(1.8 m) – WX08X10006

15(4.6 m) – WX08X10015

25(7.6 m) – WX08X10025

Be sure that the kit you select allows at least 8(2.4 m) as described above.

25

Page 25
Image 25
GE 25 and 27 installation instructions What YOU will Need

25 and 27 specifications

The GE 25 and 27 series represent a significant evolution in the realm of gas turbine technology, tailored for both industrial and power generation applications. These advanced turbines are well-regarded for their impressive efficiency, reliability, and adaptability to various operational needs.

The GE 25 engine, known for its robust design, is specifically engineered to deliver high performance in a compact footprint. It boasts a power output of approximately 25 megawatts, making it suitable for a variety of applications, including peak power generation and co-generation systems. Its features include advanced aerodynamics in the compressor section, ensuring optimal airflow and reduced pressure losses. The turbine also incorporates a sophisticated control system, enabling real-time adjustments that optimize performance while minimizing emissions.

In contrast, the GE 27 turbine achieves even greater power output, reaching up to 27 megawatts. This engine is designed with an emphasis on efficiency and reduced operational costs, making it an attractive choice for utility operators and industrial power plants. One of its key technologies includes the use of advanced materials in the turbine blades, which allow for higher operating temperatures and pressure ratios. This innovation translates to a significant boost in thermal efficiency, reducing fuel consumption and environmental impact.

Both the GE 25 and 27 utilize advanced diagnostic tools and monitoring systems. These technologies enable operators to track engine performance effectively, predicting maintenance needs and enhancing overall operational reliability. The inclusion of digital twin capabilities allows for real-time simulations that can identify potential inefficiencies before they develop into serious issues.

The modular design of these turbines facilitates quick maintenance and parts replacement, minimizing downtime and ensuring continuous power supply. Additionally, their versatility makes them suitable for a wide range of fuels, including natural gas, diesel, and even renewable biogas. This adaptability positions the GE 25 and 27 as forward-thinking solutions that align with the global push towards greener energy sources.

In summary, the GE 25 and 27 turbines exemplify modern gas turbine technology, merging high efficiency with innovative features. Their ability to perform under a variety of conditions while maintaining low emissions places them at the forefront of power generation advancements. As industries continue to seek reliable and sustainable energy solutions, the GE 25 and 27 stand as compelling options for both current and future power demands.