GE 49-60468-1 A Install Overlay Panels, Custom handles, Installation Instructions

Models: 49-60468-1

1 20
Download 20 pages 58.7 Kb
Page 15
Image 15
STEP 10A INSTALL OVERLAY PANELS

Installation Instructions

STEP 10A INSTALL OVERLAY PANELS

Right hand models shown. Use the same instructions for left hand models.

Door Trim

Handle

Trim

Refrigerator

Door

Move

Forward

For 3/4"

Panel

Use Front Holes to Secure Handle

Use Rear Holes to Secure Trim

Supplied handle shown in the

overlay panel position.

Install door and drawer panels:

Open door to 90°. Remove the 4 Phillips head screws from the door handle.

Remove handle. Retain all screws.

Remove 4 screws holding trim, lift off trim. Retain screws.

Slide overlay panel into the door trim.

There are two sets of holes in the handle side trim. Replace handle side trim by installing the original screws in the REAR screw holes.

Secure the handle to the door using the FRONT screw holes.

Follow the same procedures to install the drawer panel.

Custom handles

If you are using custom handles, the handle must be properly secured to the panel before sliding the panel into the trim.

The cabinet manufacturer will supply the custom handle and hardware.

Secure the door/drawer trim using both the FRONT and REAR screw holes. Discard supplied handle.

15

Page 15
Image 15
GE 49-60468-1 A Install Overlay Panels, Custom handles, Installation Instructions, Install door and drawer panels