Installation Instructions

Air Conditioner

Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: ge.com

BEFORE YOU BEGIN

Read these instructions completely and carefully.

IMPORTANT Save these

instructions for local inspector’s use.

IMPORTANT Observe all governing codes and ordinances.

Note to Installer – Be sure to leave these instructions with the Consumer.

Note to Consumer – Keep these instructions for future reference.

Skill level – Installation of this appliance requires basic mechanical skills.

Completion time – Approximately 1 hour

We recommend that two people install this product.

Proper installation is the responsibility of the installer.

Product failure due to improper installation is not covered under the Warranty.

You MUST use all supplied parts and use proper installation procedures as described in these instructions when installing this air conditioner.

ELECTRICAL REQUIREMENTS

The 3-prong grounding plug minimizes the possibility of electric shock hazard. If the wall outlet you plan to use is only a 2-prong outlet, it is your responsibility to have it replaced with a properly grounded 3-prong wall outlet.

Some models require 230/208-volt a.c., protected with a time delay fuse or circuit breaker. These models should be installed on their own single branch circuit for best performance and to prevent overloading house or apartment wiring circuits, which could cause a possible fire hazard from overheating wires.

CAUTION:

Do not, under any circumstances, cut or remove the third (ground) prong from the power cord.

Do not change the plug on the power cord of this air conditioner.

Aluminum house wiring may present special problems—consult a qualified electrician.

TOOLS YOU WILL NEED

Adjustable wrench

Phillips head screwdriver

Flat-blade screwdriver

Pencil

Ruler or tape measure

Level

Scissors or knife

Power cord includes a current interrupter device. A test and reset button is provided on the plug case. The device should be tested on a periodic basis by first pressing the TEST button and then the RESET button while plugged into the outlet. If the TEST button does not trip or if the RESET button will not stay engaged, discontinue use of the air conditioner and contact a qualified service technician.

9

Page 9
Image 9
GE AEH25*, AEM25*, AEM18*, AEH18* installation instructions Before YOU Begin, Electrical Requirements, Tools YOU will Need

AEH18*, AEM18*, AEH25*, AEM25* specifications

General Electric (GE) has made significant strides in the evolution of its gas turbine technology with the introduction of the AEM18*, AEM25*, AEH25*, and AEH18* series. These models are engineered to meet the growing demands for efficient, reliable, and environmentally responsible energy generation.

The AEM18* and AEM25* models focus on advanced aerodynamics and materials science to deliver high efficiency and performance. These turbines utilize a state-of-the-art combustion system that enables low emissions operation while maintaining operational flexibility. The AEM series is renowned for its capabilities in combined cycle applications, offering a high power-to-weight ratio which enhances overall system efficiency.

The AEH25* and AEH18* models build upon the advanced technology established in the AEM series but introduce enhancements aimed at heavy-duty and industrial applications. With innovative design modifications, including improved rotor dynamics and robust cooling techniques, these turbines achieve excellent reliability and availability. The AEH series is designed with high operational flexibility, capable of handling high load variations while providing consistent performance.

All four turbine models share GE's commitment to utilizing advanced digital technologies, including the Predix platform, which harnesses the power of analytics. This technology allows operators to monitor performance in real time, predict maintenance needs, and optimize operational parameters, resulting in reduced downtime and improved efficiency.

In terms of characteristics, the AEM and AEH series turbines are characterized by their modular design, which simplifies installation and maintenance processes. This design allows for easier upgrades and retrofits, ensuring that customers can adapt their systems to future technological advancements.

The environmental impact of these gas turbines cannot be understated. Both the AEM and AEH series are designed to meet rigorous emissions standards, showcasing GE's commitment to sustainability. With reduced greenhouse gas emissions and the capacity to integrate with renewable energy sources, these turbines serve as a key component in the transition to cleaner energy systems.

In summary, the GE AEM18*, AEM25*, AEH25*, and AEH18* turbines represent a culmination of innovative engineering, advanced technology, and a focus on environmental sustainability, making them suitable choices for a variety of energy generation applications in today's dynamic energy landscape.