GE JBP79 Pre-InstallationChecklist, Preparing the Range, u i cg ed, Installation Instructions

Models: JBP79

1 12
Download 12 pages 33.9 Kb
Page 3
Image 3
Pre-Installation Checklist

Installation Instructions

Pre-Installation Checklist

_' Preparing the Range

I_

Close

the oven door to

 

the broil stop

position.

 

 

 

 

 

 

Remove packaging

materials.

Any

 

 

 

 

packaging materials must be removed

 

 

 

 

during installation. This will include

 

 

 

 

adhesive tape, wire ties, cardboard and

 

 

 

 

protective plastic. Failure to remove

Place

hands

on both

 

these materials could result in damage to

 

sides of the door. As you

 

the appliance once the appliance has

 

close

the door, lift up and

 

been turned on

and

surfaces

have

 

heated.

 

 

 

away

from the range.

I_

Open oven door

and

remove literature

 

 

 

 

pack, broiler pan and grid, and oven racks.

 

 

 

 

 

_

Oven Racks

 

 

 

 

Broiler Pan _Literature

and Grid

Pack

Remove Installation Instructions

from literature pack and read it carefully before you begin. Be sure to place all literature, Use and Care, Installation

Instruction, etc. in a safe place for future reference.

Lift door up until the hinges clear the slots.

Hinge

L Clears /

Slot

_r _, ,., ._ ___, Open the oven door as

,

far as it will go.

IIoo.oT T.EoooRBYT.E II1

NOTE: The oven door is very heavy. Be sure you have a firm grip before lifting the oven door off the hinges. Use caution once the door is removed. Do

not lay the door on its handle. This could cause dents or scratches.

_z Push

the hinge locks

U__

u_i:cg:ed

frame,

to the

unlocked

"_°_t _!_

"

positiondown toward.This themaydoor

_sition

 

require a flat

blade

Hinge

screwdriver.

 

 

 

_,m

3

Page 3
Image 3
GE JBP79 Pre-InstallationChecklist, Preparing the Range, u i cg ed, Installation Instructions, IIoo.oT T.EoooRBYT.E