Installation |
|
Instructions | Electric |
JSP42, JS968, JS900, JS905, JSP46 |
If you have questions, call 1.800.GE.CARES or visit our website at: ge.com
Before You Begin | • Note to |
instructions with the consumer. | |
Read these instructions carefully and completely. | • Note to |
• | instructions for future reference. |
instructions for local inspector’s use. | • Proper installation is the responsibility |
• | of the installer and product failure due |
to improper installation is NOT covered | |
governing codes and ordinances. | under warranty. |
| • |
| grounded. |
|
|
PARTS INCLUDED |
| |
Rear Filler | Screws | |
2 Screws |
MATERIALS YOU MAY NEED
Tin Snips | Lag Bolts | Anchor Sleeves |
(For
on Concrete Floors Only)
(UL Approved 40 or 50 AMP) Squeeze Connector
(For Conduit | |||
Installations Only) | |||
4’long | 4’long | ||
|
TOOLS YOU WILL NEED
1/8” Drill Bit and | Wrench or Pliers |
Electric or Hand Drill | (for |
Level
1/4” Nut Driver
Tape Measure | Pliers |
Pencil
Straight Edge or Square
Safety Glasses
Hand or Sabre Saw
1 | ||
|
|