Installation Instructions
1
Pre-Installation Cutout and Required Clearances
If cabinets are placed less than 30” above the range, see Alternate Construction, section AF, on page 16.
30” ranges conform to U.L. requirements for 0” spacing from vertical walls below countertops. Allow 1/4” minimum clearance at the back wall above the countertop.
Wall coverings, counters and cabinets around range must withstand heat (up to 194° F) generated by the range.
5