GE JS905 installation instructions Final Checklist, Operation Checklist, Installation Instructions

Models: JS905

1 20
Download 20 pages 50.26 Kb
Page 14
Image 14
 Final Checklist

Installation Instructions

 Operation ChecklistManual background Final Checklist

Check to make sure the circuit breaker is closed (Reset) or the circuit fuses are replaced.

Be sure power is in service to the building.

Check to be sure that all packing materials and tape on metal panel (if applicable) under control knobs and drawer have been removed.

Manual backgroundManual background Operation Checklist

Check to make sure the Clock display is energized. If a series of horizontal red lines appear in the display, disconnect power immediately. Recheck the range wiring connections. If change is made to connections, retest again. If no change is required, have building wiring checked for proper connections and voltage. It is recommended that the clock be changed if the red lines appear.

Push down and turn any one of the four surface knobs to “MED” setting to observe that the element glows within 15 seconds. Turn the knob off when glow is detected. If the glow is not detected within the time limit, recheck the range wiring connections. If change is required, retest again. If no change is required, have building wiring checked for proper connections and voltage.

14

Page 14
Image 14
GE JS905 installation instructions Final Checklist, Operation Checklist, Installation Instructions