Modifications reserved Page 22/57
OPM_LPS_3UO_30K_40K_0US_V010.doc Operating Manual LP 33 Series 30 & 40 kVA
MAINS
f=60.0Hz
U1=120V U2=119V
U3=121V
1. Mains input voltage information screen.
2. Mains input frequency.
3. Mains line voltage L1 (A) and L2 (B)phases.
4. Mains line voltage L3 (C) phase.
RECTIFIER
f=60.0Hz
U1=120V U2=119V
U3=121V
1. Rectifier input vo ltage information screen.
2. Mains input frequency.
3. Input line voltage L1 (A) and L2 (B) phases.
4. Input line voltage L3 (C) phase.
INVERTER: U1=120V
U2=120V U3=120V
Frequency = 60.0Hz
Synchronized
1. Inverter voltage information screen.
2. Output inverter line voltage L1 (A), L2 (B) and L3 (C) phases
3. Output frequency.
4. Synchronization status inverter with respect to mains.
LOAD ON PHASE
U1=120V I1=56A 50%
U2=120V I2=50A 45%
U3=120V I3=61A 55%
1. Load on output phases information screen.
2. Voltage, current and load percentage phase L1 (A).
3. Voltage, current and load percentage phase L2 (B).
4. Voltage, current and load percentage phase L3 (C).
MISCELLANEOUS
Battery Temp. = +25°C
UPS Oper Time= 450h
INV Oper Time= 430h
1. Screen informing about the battery and time of operation.
2. Battery temperature.
3. Operating time (CPU powered) for the UPS (hours).
4. Operating time with inverter supplying the load (hours).
MAINS FAULTS STAT.
Minor = 100
Major = 150
Overloads = 30
1. Screen informing about the quality of the input power.
2. The quantity of bypass mains out of tolerance faults.
3. The quantity of rectifier mains out of tolerance faults.
4. The total number of detected output overloads.
IDENTIFICATION
LP 33 40kVA P1
SW Version: x.x
S/N: Q0040-0105-0001
1. Screen containing the data identifying the unit.
2. UPS family, nominal rating and for RPA: P + no. UPS.
3. The software version implemented on the control board.
4. The serial number of the unit.
ECO Mode RATE 100%
NR FAST TRANSIENT
<2ms >2ms >5ms >10ms
25 10 7 3
Screen containing the statistic evaluation in % (100= good; 0= bad)
of the utility, for the ECO Mode operation.
4. The number of fast transients occurred on the bypass utility on
the last seven days.