7.2.2Parallel UPS shutdown with load transfer on manual bypass (Q2)

The purpose of this procedure is to supply the load directly by mains through manual bypass Q2.

This procedure is normally performed when the UPS must be completely switched OFF for maintenance or service purpose, performed by an authorized Service Center.

1.Switch OFF the inverter on each unit entering the screen:

MENU/COMMAND MENU/INVERTER OFF

Attention: to switch OFF permanently the inverter the key Enter must be pressed 2 times.

The output will be supplied by the mains through all automatic bypass.

2.Switch ON the maintenance bypass Q2 (I) on each unit.

COMMAND MENU

 

INVERTER ON

 

INVERTER OFF

*

 

 

LP 33

40kVA P1

APPLICAT. ON UTILITY

= 70%

LP 33 40kVA P1

APPL. ON MANUAL DEV.

= 70%

3.Switch OFF the output switch Q1 (0) on each unit.

4.Perform the command total off on each unit.

5.Remove the battery fuses F5, F6, F7 (and eventual external fuses in case of external battery) on each unit.

Continue

Modifications reserved

Page 45/57

OPM_LPS_3UO_30K_40K_0US_V010.doc

Operating Manual LP 33 Series 30 & 40 kVA

Page 45
Image 45
GE manual Switch on the maintenance bypass Q2 I on each unit, = 70% LP 33 40kVA P1