Installation (cont’d)

DANGER

HAZARDOUS VOLTAGE

(Can Cause Severe Injury or Death)

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

ATTENTION!

This applies only to the switches with the RM4-CAT exerciser option:

Upon installation, connect the MX50/90 controller to a 9V battery (not supplied) via the harness that is con- nected to the controller. The battery should be placed in the holder installed just above the controller. This is to ensure that the setting in the exercisor clock are retained in the event of power outage. The battery should be replaced once a year. If the battery is not

installed and/or replaced as recommended, the exerciser clock will lose its settings and the exerciser will not work.

Should the harness become disconnected in shipping, take the controller cover off and plug the harness in the receptacle in the top right corner of the MX controller. Reinstall the cover and connect the battery.

Battery and Holder

Battery Harness

MX50/90 Controller

GE Zenith Controls

ZTX Operation and Maintenance Manual (62R-2000)

5

Page 7
Image 7
GE Monogram Zenith Controls, ZTX manual Battery and Holder Battery Harness MX50/90 Controller