Installation instructions

zRefer to figure 3 for in-swing door (right-hand).

Figure 3

zOpening, Closing action time and Maintain time illustration. AD-425S will be automatically counted the round trip distance and can be adjusted the opening, closing and break time.

Figure 4

„Opening angle: 90 degrees.

„Beginning

„Destination

„Brake for wall blanking function.

„VM action time is the opening and closing time.

„TC Maintain time of 1-35 seconds.

Prepare the installation

To mount the AD-425S depends on the direction way of the doors, out-swing, in-swing, right- open and left-hand doors by adjusting the F/R switch and the direction of the Operating Arm.

For the safety reason, AD-425S must be installed indoor.

Copyright All Rights Reserved.

 

P-MU-AD425S Ver. A Publish:2008.07.11

Page: 8/ 20

Page 8
Image 8
Gianni Industries AD-425S instruction manual Installation instructions, Prepare the installation