Gold's Gym GGSY3066.1 manual

Models: GGSY3066.1

1 36
Download 36 pages 761 b
Page 17
Image 17

25.Route the Lat Cable (49) over a Thin Pulley (24) and down through the Top Frame (4). Hold the Thin Pulley inside the Top Frame. Next, insert an M10 x 80mm Bolt (84) through an M10 Washer (80), a 19mm Spacer (67), the Top Frame, and the Thin Pulley.

26.Wrap the Lat Cable (49) under a 90mm Pulley (48). Attach the Pulley, a Cable Trap (56), and two Half Guards (55) at the second hole from the top of the two Pulley Plates (60) with an M10 x 50mm Bolt (97) and an M10 Nylon Locknut (77).

Make sure that the Cable Trap and Half Guards are oriented as shown.

27.Route the Lat Cable (49) up through the Top Frame (4) and wrap the Cable over a Thin Pulley (24). Pull the M10 x 80mm Bolt (84) out of the Top Frame until it is flush with the first Thin Pulley from step 24. Do not remove the Bolt com- pletely from the Top Frame.

Hold the second Thin Pulley (24) inside the Top Frame (4) and attach it with the M10 x 80mm Bolt (84), a 19mm Spacer (67), an M10 Washer (80), and an M10 Nylon Locknut (77).

25

 

24

 

 

 

84

4

 

80

49

67

 

 

 

26

 

 

 

77

 

 

 

49

 

55

55

 

 

 

60

 

 

56 48

 

60

97

 

 

27

 

 

 

24

 

 

49

80

 

84

 

 

 

24

 

 

 

67

 

 

77

17

Page 17
Image 17
Gold's Gym GGSY3066.1 manual