Storage
Storage
NOTICE
Do not use with
1.Perform Pressure Relief Procedure, page 6 (prime valve handle in down position). Leave prime valve handle in PRESSURE RELIEF position.
3.Remove remaining material from hopper.
4.Turn pump control fully
ti8793a
5.Fill material hopper with water and run pump to flush unit. Run water through material hose, tools and drain line thoroughly flush system.
bar/psi
ti15614a
2.Spray water mist on top of any remaining material in the hopper and cover hopper with lid.
3.Cover valve and tool ends to keep joint compound from hardening.
4.Submerge deflector of prime hose in bucket or cover to keep join compound from hardening.
Cleanup
1.Perform Pressure Relief Procedure, page 6 (prime valve handle in down position).
2.Flush unused material from hopper, hose, and prime hose.
ti8794ati14877a
ti11670a
6.Clean all tools.
7.Remove drain plug from hopper. Flush with water. Clean and install drain plug.
ti14879a
14 | 3A0245B |