Installation
Installation
•To avoid electric shock, turn off equipment power and shut off power at main circuit breaker before installing.
•All electrical wiring must be done by a qualified electrician and comply with all local codes and regulations.
•Do not substitute system components as this may impair intrinsic safety.
To reduce the risk of serious injury, including fluid injection, relieve pressure before installing the kit. Follow the Pressure Relief Procedure in the ProMix 2KS Operation or Service manual.
Install Color Change Control Module
Location
Install the color change control module (101) near the fluid station. The module is approved for use in a haz- ardous location. Also see your system installation man- ual. See FIG. 1.
Mounting
1.See Dimensions, page 24.
2.Ensure that the wall and mounting hardware are strong enough to support the weight of the equip- ment, fluid, hoses, and stress caused during opera- tion.
3.Using the equipment as a template, mark the mounting holes on the wall at a convenient height for the operator and so equipment is easily accessi- ble for maintenance.
4.Drill mounting holes in the wall. Install anchors as needed.
5.Bolt equipment securely.
FSL | 101 |
13
11
SV
FIG. 1: Control Module Installation
FSL
EC
11
SV
TI12828b
4 | 312787G |