1. Check the Installation

Start-Up - Evaporative Cooling Recirculating (optional)

1. Check the Installation

The media may have been removed during installation, so its orientation

should be double

45º

 

checked. The

 

media should

 

be installed with Entering Air

Leaving Air

the steeper flute

 

angle sloping

 

down towards

15º

the entering air

Media Orientation

side.

Verify that the stainless steel caps and distribution headers are in place. The headers should be located over the media towards the entering air side. The caps should be placed over the headers.

2. Check the Pump Filter

Check that the pump filter is around the pump inlet.

3. Fill the Sump and Adjust the Float

Turn on the water supply and allow the sump tank to fill. Adjust the float valve to shut-off the water supply when the sump is filled to within 1 inch of the bottom of the overflow.

4. Break-in the Media

Open the bleed-off valve completely and saturate the media with the blower(s) off for no less than 20 minutes.

Note

A jumper will need to be installed in the control center to power the evaporative pumps with the blower(s) off. Reference the unit’s ladder diagram to determine proper terminals.

5. Check the Flow Rate

The pumps should provide enough water to saturate the media in 45 to 60 seconds. Consult the factory, if adequate flow is not achieved.

6. Adjust the Water Bleed-Off Rate

The water bleed-off rate is dependent on the water’s mineral content. The bleed-off should be adjusted based on the media’s mineral deposits after two weeks of service.

7. Set the Optional Auto Drain and Fill

Set the auto drain, fill timer and temperature settings.

Timer settings are: t1: 1.0, 10min t2: 0.4, 60h

Temperature is typically set to 45°F (7°C)

8. Put the Unit into Service

Remove the jumper, and energize the blower(s). Verify proper operation.

important

Check the media for minerals after two weeks of service and adjust the bleed-off rate accordingly.

Bleed-Off

Pump

Supply

Float

Threaded Float

Valve

Filter

Connection

Valve

Adjustment

Overflow

 

 

 

 

Evaporative Cooler Set-Up

Temperature

Setting

t2 settings 2. Check the Pump Filter

t1 settings 3. Fill the Sump and Adjust the Float

Evaporative Freeze

Evaporative

Protection

Timer

®

Model MSX Make-Up Air

19

Page 19
Image 19
Greenheck Fan 470658 MSX manual Check the Installation, Check the Pump Filter, Fill the Sump and Adjust the Float