EVAPORATIVE COOLING MODULES
Mount the heat recovery unit level to ensure proper operation and water drainage.. Piping should be of adequate size to provide sufficient supply of water to meet the maximum demand of the evaporative coolers..
EVAP MODULE INSTALLATION
1.After the energy recovery unit is set in place, run the overflow and drain lines to the exterior fittings on the evaporative cooler (drain & overflow connections at unit are
EVAP MODULE START-UP
1.The cooler will be prewired by the factory.. (pumps are 115VAC)..
2.Check to make sure that the pump filter is around the pump inlet..
Indirect Evaporative Cooler
(Exhaust/Scavenger Airstream)
Direct Evaporative Cooler
(Outdoor/Supply Airstream)
3.Turn the water on and allow the sump to fill.. Adjust the float valve to
4.Open the
|
|
| associated with the media.. The media’s | ||
Side of HRE Unit |
| be no less than 20 minutes.. When the process is complete, | |||
| remove the jumper wires in the control center.. | ||||
|
|
| Note: Evaporative media may foam for a short period | ||
Drain Line | Evaporative | following the initial | |||
valve fully open until the foaming stops.. | |||||
|
| ||||
Overflow |
| Cooling |
|
| |
| Media | 5.. After the media | |||
|
| ||||
Trap |
| Sump | water flow rate over the media needs to be | ||
| checked.. The pumps should provide enough | ||||
| Manual |
| |||
|
|
| water to saturate the media in | ||
| Shutoff |
|
| ||
|
|
| minutes.. If adequate flow rate is | ||
Drain | Valve | Roof Curb |
| ||
|
| not achieved, adjust via water | |||
Line |
|
| |||
|
| Roof Line | |||
|
|
| flow adjustment device found on | ||
|
|
|
| water supply line running to evap |
Manual Shutoff Valve | header.. | |
Supply Line | ||
|
Standard Trap and Supply Line Configuration
6..The water
per square foot of media pad top area (see table at right).. Actual water to the unit will be based on the evaporation rate.. A water flow adjustment device is supplied and installed by Greenheck for ease of water flow adjustments.. After the unit has been installed and running for two weeks the unit should be checked for mineral deposits.. If there are deposits, the
|
| Media Size | Media Pad | |
|
| (w x h x d) (in.) | Top Area | |
|
|
|
| |
Supply | 18 x 36 x 12 | 1..5 ft2 | ||
Exhaust | 18 x 36 x 12 | 1..5 ft2 | ||
| ||||
|
|
|
| |
Supply | 30 x 48 x 12 | 2..5 ft2 | ||
Exhaust | 24 x 48 x 12 | 2..0 ft2 | ||
| ||||
|
|
|
| |
Supply | 36 x 56 x 12 | 3..0 ft2 | ||
Exhaust | 30 x 56 x 12 | 2..5 ft2 | ||
| ||||
|
|
|
| |
Supply | 48 x 69..5 x 12 | 4..0 ft2 | ||
Exhaust | 40 x 69..5 x 12 | 3..3 ft2 | ||
| ||||
|
|
|
|
10