Grindmaster 5511, 5311 Reassembly, See Figure AA & BB, Do not use tools to tighten knobs, Page

Models: 5311 5511

1 44
Download 44 pages 39.16 Kb
Page 16
Image 16
Reassembly

Cleaning Following Complete Disassembly of Unit (cont.)

IMPORTANT: After disassembly, thoroughly scour each part of the freezer in a warm mild detergent solution including the inside of the freezing cylinder and the mix storage hopper. Rinse each part with cleanwater. Prepare a minimum of 3 1/2 gallons (13 liters) of sanitizing solution (Divorsol CX or equiva- lent) following the manufacturer's instructions.

Note: Add 3 ounces (85.4 mg) of Diversol CX to 3 1/2 gallons (13 liters) of 120° Fahrenheit (50° Centigrade) water to achieve a concentrations of 200 parts per million. Dip or wipe each part

in sanitizing solution and allow them to dry on clean paper toweling.

Reassembly

1.Wet the inner rubber lip of the rotary portion of the seal and the back end of the auger shaft with water. Slide rotary portion of assembly onto the auger shaft, RUBBER FIRST, with the smooth sealing surface toward the back of the auger. (See Figure Z)

Figure Z Re-assemble rotary

portion of seal as shown

2.Insert the stationary portion of the seal into the grooved rubber boot with the polished surface facing out

(forward). Lubricate the grooved exterior portion of the boot and

Figure AA Installing the stationary

insert it straight back into recess at the back of the freezing cylin-

portion seal

der, RUBBER FIRST.

 

(See Figure AA & BB)

 

Note: If the circular portion of the seal is white, make sure that the

 

groove is toward the rubber (back of freezer).

 

3.Reassemble the dasher assembly, as shown in Figure CC. Insert Figure BB Seal Assembly installed correctly the larger front and smaller rear white plastic bearings into dasher,

then slip in the stator rod. Attach scraper blades. Carefully and slowly guide the auger into the freezing cylinder taking care not to damage the seal assembly. Turn auger shaft until it engages the square drive coupling.

4.Reassemble the dispensing valve assembly as shown on Figure DD.

Thoroughly wash and sanitize all components, lubricate the inside

Figure CC

bore of valve body with a thin film of food grade sanitary lubricant.

 

Reinstall the O-Rings on the plunger assembly and lubricate the

 

entire plunger. Reassemble the valve and replace the retainer pin.

 

Inspect and lubricate the large O-Ring and refit it into the rear of

 

the valve assembly. Install the valve assembly on the front studs

 

and tighten knobs until they are finger tight.

 

Do not use tools to tighten knobs.

 

Figure DD

Crathco® 5311 & 5511 Manual

Page 15

 

 

Page 16
Image 16
Grindmaster Reassembly, See Figure AA & BB, Do not use tools to tighten knobs, Crathco 5311 & 5511 Manual, Page