Grizzly G0484 owner manual Break-In, To perform the break-in procedure

Models: G0484

1 48
Download 48 pages 39.33 Kb
Page 17
Image 17
Break-In

Break-In

After successfully completing the Test Run, it is necessary run the mill/drill in each speed and direction without a load to seat the bearings.

NOTICE

Only change spindle speed when the spindle is stopped. Attempting to change spindle speeds when the spindle is in motion will damage the drive gears and bearings.

To perform the break-in procedure:

1.Press the emergency stop button in and make sure the spindle is stopped.

2.Use the gearbox levers so that the spindle RPM is set at 120.

G0484 Gear Head Mill/Drill

3.Twist the emergency stop button clockwise so that it pops out.

4.Switch the spindle rotation dial to "F" (for- ward) and let the spindle run for 10 minutes.

5.Press the emergency stop button in and wait for the spindle to stop.

6.Switch the spindle rotation dial to "R" (reverse) and let the spindle run for 10 minutes.

7.Repeat Steps 2–6for the remaining RPM ranges.

-15-

Page 17
Image 17
Grizzly G0484 owner manual Break-In, To perform the break-in procedure