INSTALLATION

14 PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger

A. Cut openings in the bin floor for the Intermediate wells. (See figure below.) The number of wells

depends on bin size. The distance between Intermediate wells and the Centerwell should be equal.

3. INTERMEDIATE WELL INSTALLATION
36' 3 17' 10-7/8" 36.363'' 53.75'' 250.888'' 36.013''
42' 4 20' 10-11/16" 32.613'' 50.00'' 286.638'' 35.950''
48' 4 23' 10-1/2" 39.863'' 57.25'' 322.388'' 35.888''
54' 4 26' 10-1/4" 47.113'' 64.50'' 358.388'' 36.138''
60' 5 29' 10-1/8" 42.363'' 59.75'' 394.138'' 36.013''
72' 6 35' 9-3/4" 44.113'' 61.50'' 465.638'' 35.888''
75' 6 37' 3-5/8" 46.613'' 64.00'' 483.638'' 36.013''
78' 6 38' 9-9/16" 49.113'' 66.50'' 501.638'' 36.075''
DISTANCE
FROM CENTER
OF BIN TO
WALL (A)
NUMBER OF
INTERMEDIATE
WELLS
BIN SIZE
DISTANCE
FROM BIN
WALL TO
ANGLE RING
DISTANCE
FROM CENTER
OF BIN TO
ANGLE RING (D)
DISTANCE
BETWEEN
WELLS (C)
DISTANCE BETWEEN
CENTERWELL AND
FIRST INTERMEDIATE
WELL (B)

FIG. 3-A INT-WELLS

INTERMEDIATE WELL LOCATION AND CUT-OUT

FIG. 3-B SIDE VIEW DISTANCE