OPERATION
42 PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger
removed by the Bin Sweep.
F. Disconnect and lockout all power to the Unload Auger.
G. Repeat Step B, moving the grain into a smaller circular pile, as shown in Figure 18-B.
H. Repeat Step C.
I. Exit the grain bin.
J. Make sure everyone is outside of the bin and clear of the equipment.
K. Start the Unload Auger with the Bin Sweep still engaged. Shortly , the swept pile will have been
removed by the Bin Sweep.
Keep out of the bin while the Bin Sweep is in operation. The Bin Sweep
travels rapidly around the bin. As the bin empties, the Bin Sweep travels
around the bin faster.
Stay clear of the Unload Auger under the floor at the Bin Wells. The Unload
Auger is exposed at these locations.
18. FINAL CLEAN-OUT
(Cont.)