Dual Gate Installation

Turn power switch OFF on the bottom of the control box. Disconnect gate openers by removing hairpin clip and clevis pin from the gate bracket end of the openers. Disconnecting the openers will allow the gates to swing freely during installation of the gate lock.

NOTE: In a DUAL GATE INSTALLATION the gate opener on the same side of the driveway as the control box is known as the MASTER GATE OPENER and that gate is refered to as the MASTER GATE. Conversly the gate opener on the other gate is refered to as the SLAVE GATE OPENER and the gate is refered to as the SLAVE GATE.

IMPORTANT: To use the gate lock on a dual gate system, the gate sequencing must be set so the MASTER GATE opens first and closes last, and the gate lock has to be mounted on the MASTER GATE and the lock receiver is mounted on the SLAVE GATE. The slave gate requires a positive stop. If your gates are not sequenced in a manner that works like this, you'll have to change the sequencing DIP switches on your gate opener control board. Follow the instructions in your gate opener installation manual for programming dual gate sequencing.

The diagrams below will show how most dual GTO/PRO® and Mighty Mule® gate sequencing is programmed. If your gate opener control board is different form these shown, please contact GTO Technical Service at 1-800-543- 1236 for additional information.

For Mighty Mule® FM702, GTO/PRO® 1000 and GTO/PRO® 2000 Dual Gate Openers

For Mighty Mule® FM502, GTO/PRO® 3000 and GTO/PRO® 4000 Dual Gate Openers

DIP switches

PULL/PUSH

4

SNGL/DUAL

3

SEQ1

2

SEQ2 ON

1

OBSTRUCT

 

SENS.

MIN

MAX

LEARN

DIP switches

 

 

 

 

 

 

MODES

LEARN TRANSMITTER

 

 

 

 

 

 

 

 

ON

1 2 3 4

 

1 2 3 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

5

 

 

 

 

 

 

6

 

 

 

6

 

 

 

 

 

 

 

7

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

OFF

ON

 

 

 

 

 

 

 

DUAL MODES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ON

1

 

 

 

 

 

1

 

 

SET LIMIT

 

 

2

 

 

 

2

 

 

 

 

 

 

3

 

 

3

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

4

 

 

 

 

 

 

 

OFF

 

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

First Operator opens first, Second Operator closes first SEQ1 = OFF SEQ2 = ON

If SEQ1 is set to OFF, and SEQ2 is set to ON, the FIRST OPERATOR will open first, and the SECOND OPERATOR will close first.

Master opens 2 secs before slave, Slave closes 8 secs before master.

Switch 1 = ON Switch 2 = OFF Switch 3= ON If Switch 1 is set to ON, Switch 2 is set to OFF and Switch 3 is set to ON, the MASTER OPERATOR will open first, and the SLAVE OPERATOR will close first.

Mighty Mule® 350 ControlCLOSEBoardTIME

SET LEARN

LIMIT REMOTE

 

 

 

ON

PULL-PUSH

 

1

 

 

2

 

 

 

MODE1

3

 

 

 

MODE2

 

 

 

4

 

 

 

LOCK/BEACON

 

 

 

 

 

 

 

 

 

RF

Master opens 2 secs before slave, Slave closes 8 secs before master.

Switch 2 = OFF Switch 3 = ON Switch 4 = OFF

If Switch 2 is set to off and Switch 3 is set to on the MASTER will open first and the SLAVE operator will close first. Switch 4 must be set to LOCK MODE to avoid damaging circuit board

Gen - 3 (Blue) Control Boards

AUTO CLOSE TIME

STALL FORCE

 

 

 

 

 

 

STATUS

 

 

 

 

 

LEARN RMT

OFF

120

MIN

 

MAX

S3

SOFT START OFF

1 2

ON

ON

 

WARNING

OFF

ON

LEARN

OPEN

PULL

3 4

DIP

PUSH

SLV OPEN

DLY.

SIMULT.

MAST LIMIT

MODE1

OFF

 

 

ON

S2

MODE2

OFF

 

 

ON

 

 

 

LEARN

SLV

LIMIT

 

S4

Master opens 2 secs before slave, Slave closes 8 secs before master.

Switch 4= OFF

If Switch 4 is set to OFF, the MASTER OPERATOR will open first, and the SLAVE OPERATOR will close first.

4

Page 5
Image 5
GTO RB909 installation manual Dual Gate Installation, Learn