Haier AB242XCAAA operation manual Operation, Change-overswitch

Models: AB242XCAAA

1 35
Download 35 pages 34.38 Kb
Page 15
Image 15
Change-over switch

Manual backgroundManual background Operation

Power Failure Compensation (to be applied for a necessary situation)

After the power failure compensation is set, if power failure suddenly occurs while the air conditioner is working, it will resume the previous working state when the power is supplied again.

Setting Method: When the wire controller is on (excluding timer mode and fan mode), press the "Sleeping" button on the remote controller 10 times within 5 seconds, and after the buzzer rings 4 times, the air conditioner will enter the state of power failure compensation.

Cancel Method: Press the "Sleeping" button on the wire controller 10 times within 5 seconds, and after the buzzer rings 2 timer, the power failure compensation mode will be

cancelled.

Notes: When a power failure suddenly occurs during the air conditioner is working after the power failure compensation is set, if the air conditioner will not be used for a long time, please cut off the power supply to prevent its operation from being resumed after the power is supplied again, or press the "Switch On/Off" button after the power comes again.

Change-over switch

Mark

ON

OFF

1

Fixed Frequency

Inverter

2

Have rise and drop

No rise and drop

3

Swing

Not Swing

4

The collection

The collection

 

temperature of

temperature of wire

 

indoor unit

controller.

 

 

 

In this series changeover switch is set:

1. OFF 2.OFF 3.ON 4.OFF

13

Page 15
Image 15
Haier AB242XCAAA operation manual Operation, Change-overswitch