Haier AB242XCAAA Installation Procedure, Preparation For The Installation, Ceiling

Models: AB242XCAAA

1 35
Download 35 pages 34.38 Kb
Page 27
Image 27
3. PREPARATION FOR THE INSTALLATION

Ceiling<Installation example> Installation Procedure

3. PREPARATION FOR THE INSTALLATION

(1) Position of ceiling opening between unit and suspending bolt.

950(Ornament panel)

890(Ceiling opening)

840(Indoor unit)

780

(Distance between suspending bolts)

A (Distance between suspending bolts)

840(Indoor unit)

890(Ceiling opening)

950(Ornament panel)

Manual background Refrigerant pipe

Suspending bolts

Ceiling

Suspending bracket

(160)

A

A

(2) Cut an opening in ceiling for installation if necessary. (when ceiling already exists.)

Manual background Refer to paper pattern for dimension of ceiling hole.

Manual background Connect all pipings (refrigerant, water drainage), wirings (inter unit cable) to indoor unit, before installation.

Manual background Cut a hole in ceiling, may be a frame should be used to ensure a smooth surface and to prevent vibration. Contact your real estate dealer

(3) Install a suspending bolt. (Use a M10 bolt)

To support the unit weight, anchor bolt shall be used in the case of already exists ceiling. For new ceiling, use built-in type bolt or parts prepared in the field.

Before going on installing adjust space between ceiling.

<Installation example>

50~100Manual background

Roof

Anchor bolt

Long nut

Suspending bolt

 

 

Note: All the above mentioned parts shall be prepared in field.

Ceiling

 

25

Page 27
Image 27
Haier AB242XCAAA operation manual Installation Procedure, Preparation For The Installation, Ceiling, Installation example