Haier AB242XCAAA Installation Procedure, Method of water charging, Cover of controll box

Models: AB242XCAAA

1 35
Download 35 pages 34.38 Kb
Page 30
Image 30
Method of water charging

Cover of controll boxManual background Installation Procedure

(2) Check if water drainage is smooth after installation.

Charge, through air outlet or inspecting hole, 1200ccd water to see water drainage.

After wiring

Check water drainage in cooling operation.

When wiring is not complete

Manual background Remove cover of control box, short connect "CHECK" terminal of the indoor unit, which is on the uper part of indoor unit PCB. Connect 1PH power to terminal 1 and 2 on terminal block.

Manual background Note, in this operation, fan will be running.

Manual background Upon confirmation of a smooth water drainage, be sure to cut off power supply and remove short connection of "CHECK" terminal.

Method of water charging

Self-provided stiff pipe

Maintenance

Water drainage port for

 

maintenance

Inspecting hole

(Drain water from

 

this hole)

 

100mm

Charge water from

 

inspecting hole

Watering can of plastic

Charge water from

pipe should be about

100 mm long

air outlet

PCB on indoor unit

Terminal block

Cover of controll box

28

Page 30
Image 30
Haier AB242XCAAA operation manual Installation Procedure, Method of water charging, Cover of controll box