Installation Procedure
(2) Check if water drainage is smooth after installation.
Charge, through air outlet or inspecting hole, 1200ccd water to see water drainage.
After wiring
Check water drainage in cooling operation.
When wiring is not complete
Remove cover of control box, short connect "CHECK" terminal of the indoor unit, which is on the uper part of indoor unit PCB. Connect 1PH power to terminal 1 and 2 on terminal block.
Note, in this operation, fan will be running.
Upon confirmation of a smooth water drainage, be sure to cut off power supply and remove short connection of "CHECK" terminal.
Method of water charging
Maintenance | |
Water drainage port for |
|
maintenance | Inspecting hole |
(Drain water from |
|
this hole) |
|
100mm | Charge water from |
| inspecting hole |
Watering can of plastic | Charge water from |
pipe should be about | |
100 mm long | air outlet |
PCB on indoor unit
Terminal block
Cover of controll box
28