Haier AB244FCAHA Before Installation, Selection of Installation Place, Installation space

Models: AB124FAAHA AB484FCAHA AB244FCAHA AB184FCAHA AB094FAAHA AB424FCAHA

1 31
Download 31 pages 64 Kb
Page 19
Image 19

Installation Procedure

1. BEFORE INSTALLATION

<Don't discard any accessories until completed>

Determine the way to carry unit to installation place.

Don't remove packing until unit reaches installation place.

If unpacking is unavoidable, protect unit properly.

2. SELECTION OF INSTALLATION PLACE

(1) Installation place shall meet the following and agreed by customers:

Place where proper air flow can be ensured.

No block to air flow.

Water drainage is smooth.

Place strong enough to support unit .

Place where inclination is not evident on ceiling.

Enough space for maintenance.

Indoor and outdoor unit piping length is within limit. (Refer to Installation Manual for outdoor unit.) Indoor and outdoor unit, power cable, inter unit cable are at least 1 m away fromT.V. radio. This is helpful to avoid picture disturbance and noise. (Even if 1 m is kept, noise can still appear if radio wave is strong)

(2)Ceiling height

Indoor unit can be installed on ceiling of 2.5-3m in height. (Refer to Field setting and Installation Manual of ornament panel.)

(3)Install suspending bolt. Check if the installation place is strong enough to hold weight. Take necessary measures in case it is not safe. (Distance between holes are marked on paper pattern. Refer to paper pattern for place which need be reinforced)

Installation space

Air outlet

1500 Over

2500 Over

310

Air inlet Air outlet

1500 Over

Air outlet

1500 Over

2500 Over

260

Air inlet Air outlet

1500 Over

AB424FCAHA AB484FCAHA

AB184FCAHA AB244FCAHA

AB094FAAHA AB124FAAHA

17

Page 19
Image 19
Haier AB244FCAHA, AB424FCAHA, AB184FCAHA Before Installation, Selection of Installation Place, Installation space